TUCSON SPRING TRAINING CAMP
BUILD EARLY-SEASON ENDURANCE ON TUCSON'S CLASSIC TRAINING ROADS

Camp spots are limited and can fill quickly — early registration recommended.
PERSONALIZED COACHING • EXPERT EDUCATION • PREMIUM SUPPORT • SUSTAINABLE PERFORMANCE

On The Bike
- Ride with CTS Coaches
- Professional Mechanics
- Nutrition & Hydration Products
- Support Vehicle
Off The Bike
- Training Presentations
- Power File Analysis
- Q&A with Coaches
- 5 Lunches, 2 Dinners
Camp Features
- Bike Build & Prep for Shipping
- Daily Bike Tune & Cleaning
- CTS Jersey
Your CTS Coaches at this Camp

All camp rides begin and end at the CTS House, located just minutes from these recommended lodging options.
Hilton Vacation Club Tucson
3855 Speedway Blvd
Tucson, AZ 85716
Extended Stay America Suites
5050 E. Grant Rd.
Tucson, AZ 85712
Additional Details
WHAT'S NOT INCLUDED
_________
OPTIONAL ADD-ONS
_________
WHAT TO BRING
_________
Camp Itinerary
DAY 1
CHECK-IN DAY - MONDAY, MARCH 8, 2027
Check In Time: 3:00-5:00pm
Check in at the CTS House, meet the coaching and support team, and leave your bike with our mechanics for assembly and inspection. You will receive your camp schedule, support bag, and CTS jersey. We will regroup at 6:00 p.m. for dinner, introductions, and an overview of the week’s training progression.
| WHERE | CTS House - 2636 N. Venice Avenue, Tucson, AZ 85712 |
| BIKE SUPPORT | Bike build, inspection, and preparation for the first full ride |
| EVENING | Catered dinner, introductions, and camp overview at the CTS House |
DAY 2
PISTOL HILL LOOP - TUESDAY, MARCH 9, 2027
Mileage: 70 miles
Elevation Gain: 2,500-3,000 ft
Time Range: 4-5 hours
The first full ride heads east toward Saguaro National Park East and Pistol Hill near Colossal Cave Mountain Park. The rolling profile and steady distance give coaches an ideal setting to establish group communication, smooth paceline movement, controlled pacing, and consistent fueling from the opening hours of camp.
| RIDE | Morning departure from the CTS House |
| LUNCH | Post-ride at the CTS House |
| COACHING / REVIEW | Training presentation and power file review following lunch |
| BIKE SERVICE | Daily tune and cleaning |
| DINNER | On your own |
DAY 3
MADERA CANYON - WEDNESDAY, MARCH 10, 2027
Mileage: 100 miles
Elevation Gain: 4,500 ft
Time Range: Approximately 6 hours
The longest ride of camp travels south toward Madera Canyon beneath the Santa Rita Mountains. This 100-mile day delivers a major aerobic workload and a practical test of pacing, hydration, and fueling. Coaches will help you manage the early miles so you can climb efficiently and complete the return to Tucson with control.
| RIDE | Morning departure from the CTS House |
| LUNCH | Post-ride at the CTS House |
| COACHING / REVIEW | Training presentation and power file review following lunch |
| BIKE SERVICE | Daily tune and cleaning |
| DINNER | On your own |
DAY 4
MOUNT LEMMON PREVIEW - THURSDAY, MARCH 11, 2027
Mileage: 40-50 miles
Elevation Gain: 3,000-3,500 ft
Time Range: 3-3.5 hours
Today’s shorter route introduces the lower slopes of Mount Lemmon so you can test gearing, pacing, and descending before the finale. Coaches will refine your sustainable effort and help you build a clear strategy for Saturday’s ascent.
| RIDE | Morning departure from the CTS House |
| POST-RIDE | Lunch, training presentation, and power file review at the CTS House |
| BIKE SERVICE | Daily tune and cleaning |
| DINNER | On your own |
DAY 5
ORO VALLEY ENDURANCE MILES - FRIDAY, MARCH 12, 2027
Mileage: 45-50 miles
Elevation Gain: 1,500 - 2,000 ft
Time Range: 3-4 hours
The volume eases without becoming a recovery spin. The rolling roads around Oro Valley emphasize efficient group riding, steady cadence, and preserving freshness for Mount Lemmon the following day.
| RIDE | Morning departure from the CTS House |
| POST-RIDE | Lunch, training presentation, and power file review at the CTS House |
| BIKE SERVICE | Daily tune and cleaning |
| DINNER | 6:00 p.m.; catered at the CTS House |
DAY 6
MOUNT LEMMON FINALE - SATURDAY, MARCH 13, 2027
Mileage: 65-80 miles
Elevation Gain: 5,500 - 8,000 ft
Time Range: 4-6 hours
The final ride climbs the Catalina Highway toward Windy Point or the Mount Lemmon summit, based on pace, conditions, and coaching guidance. Apply the week’s lessons in pacing, fueling, and climbing economy before a rewarding descent back to the CTS House for a final lunch and send-off.
| RIDE | Morning departure from the CTS House |
| POST-RIDE | Final lunch and power file review at the CTS House |
| BIKE SUPPORT | Bike pack-up for return travel |
| DEPARTURE | Following lunch, bike pack-up, and farewells |
CAMP CONCLUSION: Final lunch, power file review, bike pack-up, and farewells.
FAQs
If you have additional questions, our Athlete Services will be happy to answer them. Contact us here.




