SANTA YNEZ
EPIC ENDURANCE CAMP
BUILD BIG-MILE FITNESS ON THE LEGENDARY ROADS OF THE SANTA YNEZ VALLEY

Camp spots are limited and can fill quickly — early registration recommended.
PERSONALIZED COACHING • EXPERT EDUCATION • PREMIUM SUPPORT • SUSTAINABLE PERFORMANCE

On The Bike
- Ride with CTS Coaches
- Professional Mechanics
- Nutrition & Hydration Products
Off The Bike
- Training Presentations
- Power File Analysis
- Q&A with Coaches
Camp Features
- Bike Build & Prep for Shipping
- Daily Bike Tune & Cleaning
- CTS Jersey
Your CTS Coaches at this Camp

All camp rides begin and end at the CTS House, located just minutes from these recommended lodging options.
Corque Hotel
400 Alisal Road, Solvang, CA 93463
(805) 688-8000
The Landsby
1576 Mission Drive, Solvang, CA 93463
(805) 688-3121
Additional Details
WHAT'S NOT INCLUDED
_________
OPTIONAL ADD-ONS
_________
WHAT TO BRING
_________
Camp Itinerary
DAY 1
CHECK-IN DAY - WEDNESDAY, MAY 5, 2027
Check In Time: 2:00-4:00pm
Check in, meet the coaching and support team, and leave your bike with our mechanics for assembly and inspection. At 4:30 p.m., join an optional shakeout spin and skills refresh. We will regroup at 6:00 p.m. for dinner, introductions, and an overview of the camp.
| WHERE | CTS House - 1522 Copenhagen Court |
| BIKE SUPPORT | Bike build, inspection, and preparation for the first full ride |
| EVENING | Dinner, introductions, and camp overview at the CTS House |
DAY 2
TEPUSQUET THE DESTROYER - THURSDAY, MAY 6, 2027
Mileage: 85 miles
Elevation Gain: 6,300 ft
Time Range: 5-6 hours
From downtown Solvang, we will ride Foxen Canyon to the seldom-used Tepusquet climb, where the grade changes constantly and rewards patient pacing. After reaching the summit, a five-mile descent drops toward Highway 166 and Los Padres National Forest. We will turn around and retrace the route to Solvang, using the second half of the day to practice group efficiency, fueling, and energy management under fatigue.
| TRAINING TALK | 8:00-8:30 a.m. at the CTS House |
| RIDE | 9:00 a.m. |
| LUNCH | Post-ride at the CTS House |
| RIDE REVIEW / MASSAGE | 3:00 p.m.; massage by appointment |
| DINNER | On your own |
DAY 3
MANNY'S RIDE TO JALAMA BEACH - FRIDAY, MAY 7, 2027
Mileage: 85 miles
Elevation Gain: 6,000 ft
Time Range: 5-6 hours
Manny's Ride is a long endurance journey to Jalama Beach on quiet country roads. The route delivers more climbing than the peaceful surroundings suggest, along with technical descents that reward focus and sound line choice. At the coast, sweeping Pacific views mark the turnaround before we head back toward Solvang. When conditions cooperate, a tailwind on Santa Rosa Road provides a fast, rewarding finish.
| TRAINING TALK | 8:00-8:30 a.m. at the CTS House |
| RIDE | 9:00 a.m. |
| LUNCH | Post-ride at the CTS House |
| RIDE REVIEW / MASSAGE | 3:00 p.m.; massage by appointment |
| DINNER | Provided by CTS |
DAY 4
FIGUEROA MOUNTAIN + DRUM CANYON - SATURDAY, MAY 8, 2027
Mileage: 77 miles
Elevation Gain:7,200 ft
Time Range: 5-7 hours
The Fig Loop is one of the Santa Ynez Valley's defining challenges. Figueroa Mountain climbs roughly 3,500 feet in nearly 10 miles, demanding steady pacing and commitment before a technical descent. From there, we will add approximately 35 miles through Foxen Canyon to Los Alamos and over Drum Canyon. The final 15-mile gradual descent back to Solvang closes the camp with a demanding, memorable ride.
| TRAINING TALK | 8:00-8:30 a.m. at the CTS House |
| RIDE | 9:00 a.m. |
| LUNCH | Post-ride at the CTS House |
| RIDE REVIEW / MASSAGE | Post-ride; massage by appointment |
CAMP CONCLUSION: Post-ride lunch, power file review, bike pack-up, and farewells.
FAQs
If you have additional questions, our Athlete Services will be happy to answer them. Contact us here.



